Boom is working on a number of important infrastructure projects across Australia. Projects over the last year have included work on the Albion Bypass project south of Wollongong in New South Wales and rail level crossing removals in the Melbourne metropolitan area.
Boom is a market leader in complex engineered lifts with a reputation for working safely to tight timelines, providing lift planning expertise and specialised lifting equipment. Our Liebherr LTM-1750 hydraulic cranes, with 750 tonne lifting capacity, are perfectly suited to infrastructure projects which regularly involve a long lift radius and heavy loads.
In early 2020, Boom crews worked on three level crossing removals at Pakenham, Lyndhurst and Cheltenham in Melbourne, Victoria.
A key advantage of Boom’s choice of the LTM-1750 for these projects is its broad capability across configurations which enables placement of 60 tonne girders with the crane positioned outside the rail line. This means the crane can be set up and ready to lift before the rail line is closed.
The company’s 750 tonne mobile hydraulic cranes are servicing customers across Australia in mining and wind farms as well as infrastructure projects.